• Download mobile app
05 Jun 2026, Edition - 3979, Friday

Trending Now

  • “CM Vijay has presented 436 schemes. He has introduced long-term development initiatives under the name ‘Vetri Tamilagam’.” – Minister Nirmal Kumar
  • “The party I am going to launch will contest the next election in TN. There is no second opinion about that.” – Annamalai
  • “Annamalai’s allegation against the national leadership is incorrect. BJP has not been affected in any way by his departure from the party.” – TN BJP President Nainar Nagendran
  • “A new political mask without the names BJP and RSS, launched with Amit Shah’s approval and Modi’s blessings.” – Congress MP Manickam Tagore indirectly criticized Annamalai’s new party
  • The Chennai Meteorological Centre has issued an Orange Alert for very heavy rainfall today in the districts of Nilgiris and Covai

Businesswire

DEWA Adds 700MW to M-Station, Largest Power and Desalination Plant in UAE

by businesswireindia.com

Share
Business Wire India

HH Sheikh Hamdan bin Rashid Al Maktoum, Deputy Ruler of Dubai, Minister of Finance, and President of Dubai Electricity and Water Authority (DEWA), inaugurated the extension project of M-Station in Jebel Ali, the largest power and desalination plant in the UAE.

 

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20190430005472/en/

 
DEWA adds 700MW to M-Station, largest power and desalination plant in UAE (Photo: AETOSWire)

DEWA adds 700MW to M-Station, largest power and desalination plant in UAE (Photo: AETOSWire)

HE Saeed Mohammed Al Tayer, MD & CEO of DEWA, noted that the total cost of M-Station with its extension reached AED 11,669 billion with a current production capacity of 2,885 megawatts (MW) and 140 million gallons of desalinated water per day. The expansion cost AED 1,527 billion and added new generating units with a capacity of 700MW. The extension design has a 90% fuel efficiency rate. This project has been completed with over 20 million Safe Man Hours without Lost Time Injury.

 

Al Tayer thanked DEWA’s partners, especially Siemens, which implemented the project and Mott MacDonald, the project consultant.

 

“The completion of the Jebel Ali M-Station expansion marks another milestone in the long history of Siemens and DEWA as strategic partners. It’s a testament to what we can achieve with innovation and technology to support society and economic growth in the UAE,” said Dietmar Siersdorfer, CEO, Siemens Middle East and UAE.

 

Before the extension, M-Station generated 2,185MW of electricity from 6 Siemens F-model gas turbines, each with a capacity of 255MW, 6 Doosan Waste-Heat Recovery Boilers for steam generation, 3 Alstom steam turbines with a capacity of 218MW each. The Project included construction of 16 fuel-oil storage tanks, each with a capacity of 20,000 cubic metres and totalling 320,000 cubic metres of fuel-oil storage. The station generated 140 MIGD from 8 Fisia desalination units, deploying Multi-Stage Flash (MSF) distillation technology, each with a capacity of 17.5 MIGD and two dual-fuel-fired auxiliary boilers.

 

The expansion project comprises of two dual-fuel gas turbine generators each with a capacity of 263.5 MW, two Waste Heat-Recovery Boilers for steam generation and a back pressure steam turbine from Siemens with capacity of 173 MW. The expansion’s design increased the plant’s fuel efficiency to 85.8%, which is one of the highest rates worldwide. DEWA’s total production capacity is currently 11,100 MW of electricity and 470 MIGD of water production.

 

*Source: AETOSWire

 

 

 

 
MULTIMEDIA AVAILABLE :
https://www.businesswire.com/news/home/20190430005472/en/
Source: Businesswire
COIMBATORE WEATHER